Definition of technical solutions to expand the current charging infrastructure network, given the Municipality’s criterion of reusing existing locations with non-functioning charging infrastructure.
Definition of an alternative charging infrastructure network in Seville, assuming the absence of previous charging points for electric vehicles and in accordance with Evectra’s proven and effective methodological criteria:
Technical feasibility analysis: definition of mobility conditions in Seville, definition of the current charging infrastructure.
Economic feasibility analysis: definition of the economic investment required for the expansion of the charging infrastructure.
Legal and administrative feasibility analysis of the implementation of the network: in accordance with the law, which could be the best way to articulate the operation of the network.