Home » Study of disturbances in the electrical network
Project code: 1901466
Location
TMB Depots, Barcelona, Spain.
Date
January 2020 - April 2020
Description
TMB, aware of the effect of disturbances caused by electric vehicle charging points, considered it necessary to conduct a comprehensive study of the causes, energy indicators and effects caused by the disturbances, and to establish a methodology to counteract the adverse effects.
The main tasks carried out by Evectra were:
Analysis and classification of the main disturbances in the electricity distribution network.
Detailed analysis of the disturbances generated by the electric bus charging infrastructure.