CT power 2 2500 kVA transformers.
Charger power 150 kW
Installed power 7800 kW
Low/Medium Voltage supply
Description
A total of 52 charging points for electric buses have been installed at the Carabanchel operations centre as part of this project. The project also involved the installation of a medium-voltage distribution centre, a transformer station for phase 2, and the incorporation of rectifiers and pantographs for the commissioning of the charging points. In addition, a photovoltaic installation for self-consumption without surplus has been carried out, consisting of 833 panels and a total peak power of 333.2 kWp.