Home » Study of disturbances in the electrical network
Project code: 1901466
Location
TMB Depots, Barcelona, Spain.
Date
January 2020 - April 2020
Description
TMB, aware of the effect of disturbances caused by electric vehicle charging points, considered it necessary to conduct a comprehensive study of the causes, energy indicators and effects caused by the disturbances, and to establish a methodology to counteract the adverse effects.
The main tasks carried out by Evectra were:
Analysis and classification of the main disturbances in the electricity distribution network.
Detailed analysis of the disturbances generated by the electric bus charging infrastructure.
We use cookies to ensure that we provide you with the best possible experience on our website. If you continue to use this site, we will assume that you agree to this.